Swanzey
Swanzey, Cheshire County , Project 334191-06
Design Stormwater
What the funding was for
The funding recipient used funding to reconstruct and stabilize Webber Hill slope, provide stormwater controls and treatment for runoff, and reduce sources of sediment and other pollutant loading that impact water quality in the adjacent South Branch Ashuelot River.
Project description provided by NHDES.
How it was funded
$312,500 committed on October 19, 2022
Two funding sources combined — ARPA and CWSRF — for a total commitment of $312,500.
- ARPA $163,750 (52%)American Rescue Plan Act (ARPA)
- CWSRF $148,750 (48%)Clean Water State Revolving Fund (CWSRF)
Location
Shown at the center of Swanzey, not at the exact project site.
Where this fits: Cheshire County’s funding timeline
Between October 2022 and November 2023, NHDES committed $11,875,368 to 2 projects in Cheshire County. The largest single commitment was $11,562,868 to Jaffrey in 2023.
Oct 19, 2022
Swanzey
Design
$312,500 to reconstruct and stabilize Webber Hill slope, provide stormwater controls and treatment for runoff, and reduce sources of…
- Earliest design project
- Earliest CWSRF-funded
Nov 29, 2023
Jaffrey
Infrastructure (Construction)
$11,562,868 to design and construct a new water treatment building that will connect to the existing Turnpike well pump station. The water…
- Earliest construction project
- Earliest PFAS-funded
- Earliest DWSRF-funded
- Largest commitment
Other projects nearby
Jaffrey
Jaffrey, about 12 miles away
Infrastructure (Construction) Drinking Water
$11,562,868 committed
Emerald Lake Village District
Hillsborough, about 26 miles away
Sustainability Drinking Water
$50,000 committed
Charlestown
Charlestown, about 27 miles away
Infrastructure (Construction) Drinking Water
$4,289,000 committed
Distances are between town centers.