Dover
Dover, Strafford County , Project 334200-05
Planning Stormwater
What the funding was for
The funding recipient used the funding to conduct a preliminary evaluation of the slope stability, conduct boundary surveys, engage property owners, and optimize City easements or acquisitions that may be necessary to complete the future construction phase for the proposed Chapel Street Ravine Stormwater Treatment System.
Project description provided by NHDES.
How it was funded
$100,000 committed on September 20, 2023
Funded through ARPA, for a total commitment of $100,000.
- ARPA $100,000 (100%)American Rescue Plan Act (ARPA)
Location
Shown at the center of Dover, not at the exact project site.
Where this fits: Strafford County’s funding timeline
Between September 2023 and January 2024, NHDES committed $530,000 to 2 projects in Strafford County. The largest single commitment was $430,000 to Lee Oak Cooperative, Inc. (Barrington) in 2024.
Sep 20, 2023
Dover
Planning
$100,000 to conduct a preliminary evaluation of the slope stability, conduct boundary surveys, engage property owners, and optimize City…
- Earliest planning project
Jan 10, 2024
Lee Oak Cooperative, Inc.
Barrington
$430,000 to make drinking water improvements, which included replacement of water distribution main and the installation of a new…
- Earliest construction project
- Largest commitment
Other projects nearby
Lee Oak Cooperative, Inc.
Barrington, about 8 miles away
Infrastructure (Construction) Drinking Water
$430,000 committed
Newfields Water & Sewer
Newfields, about 11 miles away
Infrastructure (Construction) Drinking Water
$2,900,000 committed
Exeter
Exeter, about 14 miles away
Infrastructure (Construction) Wastewater
$5,280,000 committed
Allenstown
Allenstown, about 25 miles away
Infrastructure (Construction) Wastewater
$225,000 committed
Distances are between town centers.