Charlestown

Charlestown, Sullivan County · Infrastructure (Construction) · Drinking Water · $4,289,000 committed

Addressing arsenic in North Charlestown

The North Charlestown Water System had arsenic issues that needed to be resolved.

Chapter 1 of 3

Connecting two water systems

Placeholder illustration for the Charlestown project. Real photos and video will be supplied by NHDES.
Booster station and water main work (placeholder)

The project interconnected the North Charlestown Water System with the Charlestown Water System, consolidating the two. A new booster station was built as part of the work.

Chapter 2 of 3

How it was funded

NHDES committed $4,289,000 to this project from two funding sources: $3,002,300 from the Drinking Water State Revolving Fund (DWSRF) and $1,286,700 from the American Rescue Plan Act (ARPA).

Chapter 3 of 3
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.